Labor Code Groups Project Administration>Labor Code Groups

Top  Previous  Next

Overview

Labor Code Groups work like Expense Groups in that they are assigned to a Project and can limit the Labor Codes available for use in a project.  Labor Code Groups also have the ability to have Comment Templates (Fig.1) associated with them that can require the entry of specified information before a time sheet can be submitted. See Comment Templates below.  To apply a Labor Code Group to a project, a Labor Code Group drop-down has been added to Projects > Expense & GL (Fig.2).

 

LaborCodeGroups

(Fig.1)

 

LaborCodeGroupsProj

(Fig.2)