Labor Code Groups Project Administration>Labor Code Groups |
Top Previous Next |
Overview Labor Code Groups work like Expense Groups in that they are assigned to a Project and can limit the Labor Codes available for use in a project. Labor Code Groups also have the ability to have Comment Templates (Fig.1) associated with them that can require the entry of specified information before a time sheet can be submitted. See Comment Templates below. To apply a Labor Code Group to a project, a Labor Code Group drop-down has been added to Projects > Expense & GL (Fig.2).
(Fig.1)
(Fig.2)
|