ODC Section |
Top Previous Next |
Description: ODC sections control ODC transactions, but can also include OCC transactions when the Include OCC Charges box is checked.
ODC Field Descriptions are listed below
Name - Name of the ODC section.
Invoice Filters - The Invoice Filter variable is set here. This allows for using mixed-style billings on a single project without the need to create a roll-up project or an invoice group. A filter is a user-definable code that can be placed on second level nodes (usually called phases) within a project WBS. Invoice section designs (usually the labor section) can limit the phases to include by this filter. An example of their use might be a phased fixed fee plus additional service. One would place a code, (the letter F for this example) on all phases that are fixed fee and a letter H for all phases that are hourly. To place invoice filters on the phases, right click on the project name in Project Explorer within the Projects applet, then choose Invoice Filters from the right-click menu.
Print When Zero - When checked, the section will print regardless if there is any current amount to be billed.
WBS Levels
Post
Expense Cap - This is where the expense cap is enforced. The options are Direct Expense and Markup. You can cap the cost or the billable value.
Columns - A list of Fields that can be added to the Dataset of the labor RDL file.
Note: Checking the box simply adds the field to the Dataset in the RDL file. It does not make the information show up on the section in the invoice. To have the information show up on the invoice, you must download the section, tweak it, and then upload it back into the system.
|