Description
The Charge Organization Analysis report allows you to do an analysis of the Charge Org. (recorded in Time Sheets) versus what the system currently would assign based on project setup rules. This report is useful if you set up the project rules after time sheets have already been entered. This report has an option so you can retroactively update time sheets.
Prompt
Date Ranges
• | Start Date - Beginning Date used to filter the transactions that are brought into this report. |
• | End Date - Ending Date used to filter the transactions that are brought into this report. |
General
• | Project - Allows you to filter to a specific Project. When blank, All Projects are returned. |
• | Update Timesheets - When selected, Time Sheets are updated, retroactively. The "Time Sheet Org." will be changed to the "Calculated Org." |
Report
Report Columns
• | Time ID - The Time Sheet ID of the time sheet that has a mis-match of the Time Sheet Org. and the Calculated Org. |
• | Project - The Project associated with the time sheet that has a mis-match of the Time Sheet Org. and the Calculated Org. |
• | Work Date - The Work Date of the Time Sheet. |
• | Time Sheet Org. - The Org. Unit that was assigned at the point of time entry with the project setup rules at that time. |
• | Calculated Org. - The Org. Unit that would be assigned with the project setup rules at the current time. |
• | Employee - Employee Code and Name |
• | PE Date - The Period End Date of the Time Sheet |
Sample(s)
|