Recalculate Markups Project Administration> Recalculate Markups

Top  Previous  Next

Overview

The Recalculate Markups utility allows the user to recalculate the markups on non-labor project cost transactions. The ability to recalculate markups is used when the markup is set on a project or expense code after transactions have already been entered. To recalculate markups, the user must have permission (via the Permissions applet in the Administration module).

 


 

Key Concepts

Project Override Expense for ODC (Other Direct Charges) and CNS (Consultant Expense), can be set at any level of the WBS (Work Breakdown Structure).
Setting the Markup at lower levels will override higher levels (e.g., task overrides phase, phase overrides project).
Access the Markup Overrides by right-clicking on the Project Name in the Project Explorer (in the Projects Applet). Accordingly, the Markup fields on the Exp/GL tab have been removed. More on Project Setup

Note: In order to access the Recalculate Markups Applet, you will need to have permission via the Permissions applet, located in the Administration Module.

Field Descriptions

Limit Transactions By (Dates)

Do Not Limit - Does not limit the recalculation by a date range
Transaction Date Range -  Allows for the user to select a transaction date range to filter the transactions to be recalculated.
Period Range - Allows for the user to select a period range to filter the transactions to be recalculated.

 

Limit Transactions By (Expense Codes)

Do Not Limit - Does not limit the recalculation by a date range
Expense Codes -  Allows for the user to select an Expense Code to filter the transactions to be recalculated.
Expense Group - Allows for the user to select an Expense Group to filter the transactions to be recalculated.

 

Statuses To Include

Ready - When checked, time line items with a bill status of Ready to Bill will be included.
Hold - When checked, time line items with a bill status of Hold will be included.
Never Billed - When checked, time line items with a bill status of Never Bill will be included.
Billed - When checked, time line items with a bill status of Billed will be included.
Write Off - When checked, time line items with a bill status of Write Off will be included.

 

Include PM Types

ODC - When checked, the recalculation includes expenses that are Other Direct Charges.
OCC - When checked, the recalculation includes expenses that are Out of Contract Consultants.
ICC - When checked, the recalculation includes expenses that are In Contract Consultants.

 

Only This Project (leave blank for all)

Lookup - Here you can select a specific project for which to recalculate markup or leave blank for all projects.