Overview
Project history is used to enter historical labor against a project. All other metrics can be entered through the accounting journal (typically using the general journal). A special screen is needed for labor since it would be difficult (sometimes impossible) to enter this in timesheet adjustments without going down to the detail level.
Key Concepts
• | Entries in this screen are transferred into the time sheet tables. |
• | They are flagged as historical entries so that will not appear in time sheet adjustments, nor can they be invoiced or be part of labor distribution. |
• | They will appear on Project Management reports. |
• | Historical labor transactions can be entered, viewed, and deleted through this screen. |
Additional Toolbar Options
Aside from the standard toolbar options this applet has the following options:
• | Add Entry - When selected, an entry is made if the correct fields are filled out. |
|